Rapid Delivery for Water Pump Capacitor - Replacement Drain Pump For Frigidaire – Win-Win
Short Description:
Rapid Delivery for Water Pump Capacitor - Replacement Drain Pump For Frigidaire – Win-Win Detail:
Product Features:
| ModelNumber |
WW-HY-DP-018 |
|
Phase |
Single Phase |
|
Rated Voltage |
110-120VAC |
|
Rated Frequency |
50/60Hz |
|
Power |
85W |
|
Flow Rate |
45L/Min |
|
Lift |
1.5m |
|
Current |
1.4A |
|
Noise |
≤45db |
|
Insulation |
Class F |
|
Rotor Rotation |
3000rpm |
|
Winding |
Copper winding with thermo protector |
|
Temprature Rise |
Winding temperature rise ≤ 115K,under 1.06 times rated voltage and rated head |
|
Net Weight |
850g |
|
Delivery Time |
Normally 30-35 days after receive the deposit |
|
Payment Terms |
30% TT advance,70% before shipment |

Packing Information:
| Packing QTY |
30pcs per carton |
|
Outer Carton Size |
59.5*34.5*40.5cm |
|
N.W |
23kg |
|
G.W |
26kg |


Specialized in the quality replacement drain pump for frigidaire manufacturing, Win-Win EA is one of the leading such manufacturers and suppliers in China, who can also offer you customized service. Welcome to wholesale replacement drain pump for frigidaire made in China with us.
Product detail pictures:




Related Product Guide:
Top 10 Tips for Choosing a Washing Machine
Amazing History Of The Washing Machine
Good quality comes initial; company is foremost; small business is cooperation" is our business philosophy which is frequently observed and pursued by our business for Rapid Delivery for Water Pump Capacitor - Replacement Drain Pump For Frigidaire – Win-Win, The product will supply to all over the world, such as: Costa Rica , Slovak Republic , Istanbul , You can do one-stop shopping here. And customized orders are acceptable. Real business is to get win-win situation, if possible, we would like to provide more support for customers. Welcome all nice buyers communicate details of products and ideas with us!!
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.




